Tag Archives: Martin Dam

Dam relicensing proposal ‘fair, thorough and all-inclusive’

First, I’ll touch on the current hot-button issue of the Martin Dam re-licensing process. Criticism of the process has appeared recently, some factual and some less so.

Read more
MartinDam_7241_20110916

Water Power

Lake Martin. Through the eyes of a child, it means fun summer days spent exploring, fishing with grandpa, or taking that first big boat ride. For a teenager, it’s waterlogged weekend trips “catching rays” at Chimney Rock. For adults, it’s a temporary refuge from the stress of the “real world.” For the retired couple, it’s a place to finally relax.

Read more
WaterLevel_1833_20100924

The Lake Level Issue

The proposed rule curve change is possibly the most complex issue being addressed in the relicensing process, not only because of the complicated science involved with the studies but also because of the intense stakeholder interest.

Read more
Hut_8865

The Simple Life

On a small point on the main run of the Tallapoosa River, about halfway between Camp ASCCA and Martin Dam, sits a tiny, two-room cabin. The Hut is only about 20 by 24 feet.

Read more